Application and construction/installation points of fluorine lined anti-corrosion discharge valve

date:2024-05-20 10:11
1. Before installing the fluorine lined anti-corrosion discharge valve, a visual inspection must be carried out, and the valve nameplate should comply with the current GB standard "General Valve Markings" GB 12220. For valves with a working pressure greater than 1.0 MPa and serving as a cut-off on the main pipeline, strength and tightness tests should be conducted before installation. Only after passing the tests can they be used. During the strength test, the test pressure should be 1.5 times the nominal pressure, and the duration should not be less than 5 minutes. The valve casing and packing should have no leakage, which is considered qualified. During the tightness test, the test pressure is 1.1 times the nominal pressure; The test pressure should meet the requirements of GB 50243 standard during the duration of the test, and it is qualified if there is no leakage on the sealing surface of the valve disc.
 
2. All types of manual valves installed on insulated pipelines with fluorine lined anti-corrosion discharge valves must not have their handles facing downwards.
 
3. The installation position, height, and inlet/outlet direction must meet the design requirements, and the connection should be firm and tight.
 
Application and construction/installation points of fluorine lined anti-corrosion discharge valve
 
1) The installation position, height, and inlet/outlet direction must meet the design requirements, and the connection should be firm and tight.
 
2) All types of manual valves installed on insulated pipelines must not have their handles facing downwards.
 
3) Before valve installation, a visual inspection must be carried out, and the nameplate of the valve should comply with the current GB standard "General Valve Markings" GB 12220. For valves with a working pressure greater than 1.0 MPa and serving as a cut-off on the main pipeline, strength and tightness tests should be conducted before installation. Only after passing the tests can they be used. During the strength test, the test pressure should be 1.5 times the nominal pressure, and the duration should not be less than 5 minutes. The valve casing and packing should have no leakage, which is considered qualified. During the tightness test, the test pressure is 1.1 times the nominal pressure; The test pressure should meet the requirements of GB 50243 standard during the duration of the test, and it is qualified if there is no leakage on the sealing surface of the valve disc.

Founded in 1968, LVF valve company of the United States is a recognized manufacturer of high-quality valves in the global valve industry.

CONTACT US

Hot-Line: 400-0367-125

CellPhone: 13771248999

E-mail: 13771248999@163.com

主营:LVF阀门,美国LVF阀门,进口LVF阀门,LVF锻钢阀门